Activities of restricted duration in network time models of contruction projects |
Tartalom: | http://hdl.handle.net/10890/51312 |
---|---|
Archívum: | Műegyetem Digitális Archívum |
Gyűjtemény: |
1. Tudományos közlemények, publikációk
Konferenciák gyűjteményei Creative Construction Conference Creative Construction Conference, 2023 |
Cím: |
Activities of restricted duration in network time models of contruction projects
|
Létrehozó: |
Vattai, Zoltán A.
Mályusz, Levente
|
Kiadó: |
Budapest University of Technology and Economics
|
Dátum: |
2023-08-03T09:09:57Z
2023-08-03T09:09:57Z
2023
|
Tartalmi leírás: |
Activities of fixed-, flexible-, intermittent-, distributable-, and unknown duration in general network time models are discussed in the paper on basis of preset lower and upper bounds on their time extent. After a short historical review, we discuss the theoretical background and we introduce a modified Floyd-Warshall algorithm to calculate a generalized network time model (GTM) highlighting differences of well-known techniques of PERT, CPM, MPM and PDM. Finally, we publish a small construction problem to demonstrate practical application and modelling activities of these kinds.
|